Skip to contentUnited States · Official-source record

# Plumber license requirements in Wyoming

Wyoming has no statewide plumber license; some cities or counties license plumbers.

[View source](https://www.cheyennecity.org/Services/Building-Safety)

### What the source says

> Each company is required to have a Contracting Company license and an Individual Qualified Supervisor . These must be applied and reviewed together.

## Credential status

Licensing level

Local only (some cities or counties) [View source](https://www.cheyennecity.org/Services/Building-Safety)

### What the source says

> Each company is required to have a Contracting Company license and an Individual Qualified Supervisor . These must be applied and reviewed together.

## Local programs

### Plumbing (C1) [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> 18.9 Plumbing. (C1) The installation, demolition, repair or alteration of plumbing and pipe fitting systems, equipment, and materials (excluding fire sprinklers). Requires limited electrical — HVAC (type 3) license in order to perform electrical work on the load side of the disconnect.

Jurisdiction

City of Cheyenne [View source](https://www.cheyennecity.org/Services/Building-Safety)

### What the source says

> Building Permitting & Licensing Division issues construction related permits and provides plan review and inspection services with regard to building, plumbing, mechanical and electrical construction in the City limits of Cheyenne.

Exam provider

ICC, NICET, NASCLA, or other testing agencies approved by the Board [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> maintain a listing of examinations for licenses of which shall be administered by the International Code Council (ICC), National Institute for Certification in Engineering Technologies (NICET), National Association of State Contractors Licensing Agency (NASCLA), or other testing agencies approved by the Board.

Application fee

$50 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Contractor License Fees:
> Application     Initial         Renewal
> Class A                              $50.00       $600.00       $200.00
> Class B                              $50.00       $400.00       $100.00
> Class R/R Limited                     $50.00       $400.00       $100.00
> Class C1 – Tested                     $50.00       $200.00       $75.00

License fee

$200 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Contractor License Fees:
> Application     Initial         Renewal
> Class A                              $50.00       $600.00       $200.00
> Class B                              $50.00       $400.00       $100.00
> Class R/R Limited                     $50.00       $400.00       $100.00
> Class C1 – Tested                     $50.00       $200.00       $75.00

Renewal term (years)

1 [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> All licenses issued by the Contractor Licensing Board pursuant to these regulations shall expire annually, one year from the date of issuance.

Insurance required

Yes [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> In addition to passing the appropriate examination and paying license fees, the contractor must obtain worker's compensation and liability insurance, as described in detail in Section 3.4 below.

Person of record required

Yes [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> An entity may be issued a contractor license under these regulations only if the entity always employs, in an active full-time capacity, a qualified supervisor or master.

Not stated in the official sources we checked: Experience, Classroom training, Exam required, Exam questions, Exam time (minutes), Passing mark (%), Open book, Exam fee, Continuing education, Minimum age, Prerequisite license, Bond required, Code book, Code edition.

### Master level craft employee (plumbing) [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Master level craft employee.

Jurisdiction

City of Cheyenne [View source](https://www.cheyennecity.org/Services/Building-Safety)

### What the source says

> Building Permitting & Licensing Division issues construction related permits and provides plan review and inspection services with regard to building, plumbing, mechanical and electrical construction in the City limits of Cheyenne.

Exam required

Yes [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Master level craft employee. Four (4) years with eight thousand (8,000) hours documented experience as an apprentice, or certified equivalent training, in the field and three (3) years with six thousand (6,000) hours documented experience as a journeyman and possession of satisfactory examination results.

Exam provider

ICC, NICET, NASCLA, or other testing agencies approved by the Board [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> maintain a listing of examinations for licenses of which shall be administered by the International Code Council (ICC), National Institute for Certification in Engineering Technologies (NICET), National Association of State Contractors Licensing Agency (NASCLA), or other testing agencies approved by the Board.

Application fee

$50 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Building Trade License Fees: Application Initial Renewal Qualified Supervisor or Master $50.00 $50.00 $25.00

License fee

$50 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Building Trade License Fees: Application Initial Renewal Qualified Supervisor or Master $50.00 $50.00 $25.00

Renewal term (years)

1 [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> All licenses issued by the Contractor Licensing Board pursuant to these regulations shall expire annually, one year from the date of issuance.

Not stated in the official sources we checked: Experience, Classroom training, Exam questions, Exam time (minutes), Passing mark (%), Open book, Exam fee, Continuing education, Minimum age, Prerequisite license, Insurance required, Bond required, Code book, Code edition.

### Journeyman level craft employee (plumbing) [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Journeyman level craft employee.

Jurisdiction

City of Cheyenne [View source](https://www.cheyennecity.org/Services/Building-Safety)

### What the source says

> Building Permitting & Licensing Division issues construction related permits and provides plan review and inspection services with regard to building, plumbing, mechanical and electrical construction in the City limits of Cheyenne.

Experience

8,000 hours [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Four (4) years with eight thousand (8,000) hours documented experience, in the trade, as a licensed apprentice, or certified equivalent training, and possession of satisfactory examination results.

Exam required

Yes [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Four (4) years with eight thousand (8,000) hours documented experience, in the trade, as a licensed apprentice, or certified equivalent training, and possession of satisfactory examination results.

Exam provider

ICC, NICET, NASCLA, or other testing agencies approved by the Board [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> maintain a listing of examinations for licenses of which shall be administered by the International Code Council (ICC), National Institute for Certification in Engineering Technologies (NICET), National Association of State Contractors Licensing Agency (NASCLA), or other testing agencies approved by the Board.

Application fee

$50 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Building Trade License Fees: Application Initial Renewal Qualified Supervisor or Master $50.00 $50.00 $25.00 Journeyman/Fire Technician $50.00 $30.00 $15.00

License fee

$30 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Building Trade License Fees: Application Initial Renewal Qualified Supervisor or Master $50.00 $50.00 $25.00 Journeyman/Fire Technician $50.00 $30.00 $15.00

Renewal term (years)

1 [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> All licenses issued by the Contractor Licensing Board pursuant to these regulations shall expire annually, one year from the date of issuance.

Not stated in the official sources we checked: Classroom training, Exam questions, Exam time (minutes), Passing mark (%), Open book, Exam fee, Continuing education, Minimum age, Prerequisite license, Insurance required, Bond required, Code book, Code edition.

### Apprentice level craft employee (plumbing) [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Apprentice level craft employee.

Jurisdiction

City of Cheyenne [View source](https://www.cheyennecity.org/Services/Building-Safety)

### What the source says

> Building Permitting & Licensing Division issues construction related permits and provides plan review and inspection services with regard to building, plumbing, mechanical and electrical construction in the City limits of Cheyenne.

Application fee

$10 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Building Trade License Fees: Application Initial Renewal Qualified Supervisor or Master $50.00 $50.00 $25.00 Journeyman/Fire Technician $50.00 $30.00 $15.00 Voltage Technician $25.00 $25.00 $15.00 Electrical Technician $25.00 $25.00 $15.00 Apprentice/Fire Rook $10.00 $10.00 $5.00

License fee

$10 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Building Trade License Fees: Application Initial Renewal Qualified Supervisor or Master $50.00 $50.00 $25.00 Journeyman/Fire Technician $50.00 $30.00 $15.00 Voltage Technician $25.00 $25.00 $15.00 Electrical Technician $25.00 $25.00 $15.00 Apprentice/Fire Rook $10.00 $10.00 $5.00

Renewal term (years)

1 [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> All licenses issued by the Contractor Licensing Board pursuant to these regulations shall expire annually, one year from the date of issuance.

Not stated in the official sources we checked: Experience, Classroom training, Exam required, Exam provider, Exam questions, Exam time (minutes), Passing mark (%), Open book, Exam fee, Continuing education, Minimum age, Prerequisite license, Insurance required, Bond required, Code book, Code edition.

### Residential Plumbing/Mechanical Journeyman [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Residential Plumbing/Mechanical Journeyman.

Jurisdiction

City of Cheyenne [View source](https://www.cheyennecity.org/Services/Building-Safety)

### What the source says

> Building Permitting & Licensing Division issues construction related permits and provides plan review and inspection services with regard to building, plumbing, mechanical and electrical construction in the City limits of Cheyenne.

Experience

4,000 hours [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Two (2) years with four thousand (4,000) hours documented experience, in the trade, as a licensed apprentice, and possession of satisfactory results of the applicable Journeyman examination.

Exam required

Yes [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Two (2) years with four thousand (4,000) hours documented experience, in the trade, as a licensed apprentice, and possession of satisfactory results of the applicable Journeyman examination.

Exam provider

ICC, NICET, NASCLA, or other testing agencies approved by the Board [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> maintain a listing of examinations for licenses of which shall be administered by the International Code Council (ICC), National Institute for Certification in Engineering Technologies (NICET), National Association of State Contractors Licensing Agency (NASCLA), or other testing agencies approved by the Board.

Application fee

$50 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Building Trade License Fees: Application Initial Renewal Qualified Supervisor or Master $50.00 $50.00 $25.00 Journeyman/Fire Technician $50.00 $30.00 $15.00

License fee

$30 USD [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> Building Trade License Fees: Application Initial Renewal Qualified Supervisor or Master $50.00 $50.00 $25.00 Journeyman/Fire Technician $50.00 $30.00 $15.00

Renewal term (years)

1 [View source](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)

### What the source says

> All licenses issued by the Contractor Licensing Board pursuant to these regulations shall expire annually, one year from the date of issuance.

Not stated in the official sources we checked: Classroom training, Exam questions, Exam time (minutes), Passing mark (%), Open book, Exam fee, Continuing education, Minimum age, Prerequisite license, Insurance required, Bond required, Code book, Code edition.

### Plumbing Contractor [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> PLUMBING CONTRACTOR authorizes the contractor to conduct, carry on or engage in the business of any plumbing work, including the installation of steam or water boilers.

Jurisdiction

City of Casper [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> The following information correlates with the individual and contractor license categories associated with the plumbing and mechanical trades that are offered though the Community Development Department.

License fee

$300 USD [View source](https://www.casperwy.gov/Community%20Development/License%20Applications/Plumbing%20and%20Mechanical%20Revised%20Cover%20Sheet%20(Current%20Fees).pdf)

### What the source says

> MECHANICAL/PLUMBING
> CONTRACTOR1
> $300.00 $150.00

Prerequisite license

full-time licensed master plumber [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> Every applicant shall possess or provide proof of employment of a full-time licensed master plumber.

Insurance required

Yes [View source](https://www.casperwy.gov/Community%20Development/License%20Applications/Plumbing%20and%20Mechanical%20Revised%20Cover%20Sheet%20(Current%20Fees).pdf)

### What the source says

> ALL INDIVIDUALS APPLYING FOR A CONTRACTOR’S LICENSE MUST SHOW PROOF OF CURRENT
> $250,000/$500,000 PERSONAL INJURY AND $250,000 PROPERTY DAMAGE LIABILITY INSURANCE AS A
> MINIMUM.

Person of record required

Yes [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> Every applicant shall possess or provide proof of employment of a full-time licensed master plumber.

Not stated in the official sources we checked: Experience, Classroom training, Exam required, Exam provider, Exam questions, Exam time (minutes), Passing mark (%), Open book, Application fee, Exam fee, Renewal term (years), Continuing education, Minimum age, Bond required, Code book, Code edition.

### Master Plumber [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> MASTER PLUMBER authorizes the contractor to do plumbing work that may be required of a master plumber.

Jurisdiction

City of Casper [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> The following information correlates with the individual and contractor license categories associated with the plumbing and mechanical trades that are offered though the Community Development Department.

Exam required

Yes [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> Applicants shall also provide proof of successful testing which is applicable to the license category being applied for.

Exam provider

International Code Council (ICC) [View source](https://www.casperwy.gov/Community%20Development/License%20Applications/Plumbing%20and%20Mechanical%20Revised%20Cover%20Sheet%20(Current%20Fees).pdf)

### What the source says

> MASTER PLUMBER: International Code Council (I.C.C.) G27-N or equivalent.

License fee

$75 USD [View source](https://www.casperwy.gov/Community%20Development/License%20Applications/Plumbing%20and%20Mechanical%20Revised%20Cover%20Sheet%20(Current%20Fees).pdf)

### What the source says

> MECHANICAL/PLUMBING
> MASTER2
> $75.00
> $37.50

Not stated in the official sources we checked: Experience, Classroom training, Exam questions, Exam time (minutes), Passing mark (%), Open book, Application fee, Exam fee, Renewal term (years), Continuing education, Minimum age, Prerequisite license, Insurance required, Bond required, Code book, Code edition.

### Journeyman Plumber [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> JOURNEYMAN PLUMBER authorizes the contractor to do plumbing work that may be required of a journeyman plumber as an employee of a plumbing contractor.

Jurisdiction

City of Casper [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> The following information correlates with the individual and contractor license categories associated with the plumbing and mechanical trades that are offered though the Community Development Department.

Exam required

Yes [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> Applicants shall also provide proof of successful testing which is applicable to the license category being applied for.

Exam provider

International Code Council (ICC) [View source](https://www.casperwy.gov/Community%20Development/License%20Applications/Plumbing%20and%20Mechanical%20Revised%20Cover%20Sheet%20(Current%20Fees).pdf)

### What the source says

> JOURNEYMAN PLUMBER: International Code Council (I.C.C.) G27-N, G28-N, or equivalent.

License fee

$25 USD [View source](https://www.casperwy.gov/Community%20Development/License%20Applications/Plumbing%20and%20Mechanical%20Revised%20Cover%20Sheet%20(Current%20Fees).pdf)

### What the source says

> MECHANICAL/PLUMBING
> JOURNEYMAN2
> $25.00
> $15.00

Not stated in the official sources we checked: Experience, Classroom training, Exam questions, Exam time (minutes), Passing mark (%), Open book, Application fee, Exam fee, Renewal term (years), Continuing education, Minimum age, Prerequisite license, Insurance required, Bond required, Code book, Code edition.

### Apprentice Plumber [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> APPRENTICE PLUMBER authorizes the contractor to do plumbing work that may be required of an apprentice plumber as an employee of a plumbing contractor.

Jurisdiction

City of Casper [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> The following information correlates with the individual and contractor license categories associated with the plumbing and mechanical trades that are offered though the Community Development Department.

License fee

$3 USD [View source](https://www.casperwy.gov/Community%20Development/License%20Applications/Plumbing%20and%20Mechanical%20Revised%20Cover%20Sheet%20(Current%20Fees).pdf)

### What the source says

> MECHANICAL/PLUMBING
> APPRENTICE
> $3.00
> $3.00

Prerequisite license

employment with a plumbing contractor [View source](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)

### What the source says

> An Apprentice Plumber license shall be issued to the plumbing contractor in the name of the applicant and shall be valid only for the term of their employment with that contractor.

Not stated in the official sources we checked: Experience, Classroom training, Exam required, Exam provider, Exam questions, Exam time (minutes), Passing mark (%), Open book, Application fee, Exam fee, Renewal term (years), Continuing education, Minimum age, Insurance required, Bond required, Code book, Code edition.

### Plumbing Contractor [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Plumbing Contractor $150 $50

Jurisdiction

City of Gillette [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> The following Class D Plumbing licenses are issued for the term of one year by the Board of Examiners in compliance with the applicable provisions of this Code

License fee

$150 USD [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Plumbing Contractor $150 $50

Renewal term (years)

1 [View source](https://www.gillettewy.gov/files/assets/public/v/7/development-services/documents/2026-contractor-license-application-new-revised.pdf)

### What the source says

> TERMS - Licenses are issued for a term of one year and are renewed ANNUALLY with the submittal of an application fee and required documentation.

Prerequisite license

Master Plumber [View source](https://www.gillettewy.gov/files/assets/public/v/7/development-services/documents/2026-contractor-license-application-new-revised.pdf)

### What the source says

> The plumbing contractor shall designate a Master of Record who is either a full-time employee or an owner of the entity. The Master of Record shall be licensed with the City as a Master Plumber.

Insurance required

Yes [View source](https://www.gillettewy.gov/files/assets/public/v/7/development-services/documents/2026-contractor-license-application-new-revised.pdf)

### What the source says

> Certificate of Liability Insurance - Coverage: Applicant shall submit a Certificate of General Liability Insurance showing applicant has current liability insurance meeting the following minimum requirements (per occurrence/total aggregate) and indicate coverage for the Class of License(s) the applicant wishes to hold:

Bond required

Yes [View source](https://www.gillettewy.gov/files/assets/public/v/7/development-services/documents/2026-contractor-license-application-new-revised.pdf)

### What the source says

> Surety/License and Permit Bond - Coverage: Applicant shall acquire a Bond in the amount of not less than Five Thousand Dollars ($5,000) and shall submit the Bond to the Building Inspection Division.

Person of record required

Yes [View source](https://www.gillettewy.gov/files/assets/public/v/7/development-services/documents/2026-contractor-license-application-new-revised.pdf)

### What the source says

> The plumbing contractor shall designate a Master of Record who is either a full-time employee or an owner of the entity. The Master of Record shall be licensed with the City as a Master Plumber.

Code book

International Plumbing Code [View source](https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf)

### What the source says

> The City has adopted the following construction codes: 2024 International Building Code (2024 IBC), 2024 International Residential Code (2024 IRC), 2024 International Plumbing Code (2024 IPC), 2024 International Mechanical Code (2024 IMC), 2024 International Fuel Gas Code (2024 IFGC), 2024 International Fire Code (2024 IFC), 2024 International Existing Building Code (2024 IEBC), 1997 Uniform Code for the Abatement of Dangerous Buildings, and the 2023 National Electric Code (2023 NEC).

Code edition

2024 [View source](https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf)

### What the source says

> The City has adopted the following construction codes: 2024 International Building Code (2024 IBC), 2024 International Residential Code (2024 IRC), 2024 International Plumbing Code (2024 IPC), 2024 International Mechanical Code (2024 IMC), 2024 International Fuel Gas Code (2024 IFGC), 2024 International Fire Code (2024 IFC), 2024 International Existing Building Code (2024 IEBC), 1997 Uniform Code for the Abatement of Dangerous Buildings, and the 2023 National Electric Code (2023 NEC).

Not stated in the official sources we checked: Experience, Classroom training, Exam required, Exam provider, Exam questions, Exam time (minutes), Passing mark (%), Open book, Application fee, Exam fee, Continuing education, Minimum age.

### Master Plumber [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Master Plumber:

Jurisdiction

City of Gillette [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> The following Class D Plumbing licenses are issued for the term of one year by the Board of Examiners in compliance with the applicable provisions of this Code

Exam required

Yes [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Master Plumbers and Journeyman Plumbers must show that they have passed the ICC test to receive a plumbing license.

Exam provider

International Code Council (ICC) [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Master Plumbers and Journeyman Plumbers must show that they have passed the ICC test to receive a plumbing license.

License fee

$50 USD [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Master Plumber $50 $50

Renewal term (years)

1 [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> The following Class D Plumbing licenses are issued for the term of one year by the Board of Examiners in compliance with the applicable provisions of this Code

Code book

International Plumbing Code [View source](https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf)

### What the source says

> The City has adopted the following construction codes: 2024 International Building Code (2024 IBC), 2024 International Residential Code (2024 IRC), 2024 International Plumbing Code (2024 IPC), 2024 International Mechanical Code (2024 IMC), 2024 International Fuel Gas Code (2024 IFGC), 2024 International Fire Code (2024 IFC), 2024 International Existing Building Code (2024 IEBC), 1997 Uniform Code for the Abatement of Dangerous Buildings, and the 2023 National Electric Code (2023 NEC).

Code edition

2024 [View source](https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf)

### What the source says

> The City has adopted the following construction codes: 2024 International Building Code (2024 IBC), 2024 International Residential Code (2024 IRC), 2024 International Plumbing Code (2024 IPC), 2024 International Mechanical Code (2024 IMC), 2024 International Fuel Gas Code (2024 IFGC), 2024 International Fire Code (2024 IFC), 2024 International Existing Building Code (2024 IEBC), 1997 Uniform Code for the Abatement of Dangerous Buildings, and the 2023 National Electric Code (2023 NEC).

Not stated in the official sources we checked: Experience, Classroom training, Exam questions, Exam time (minutes), Passing mark (%), Open book, Application fee, Exam fee, Continuing education, Minimum age, Prerequisite license, Insurance required, Bond required.

### Journeyman Plumber [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Journeyman Plumber:

Jurisdiction

City of Gillette [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> The following Class D Plumbing licenses are issued for the term of one year by the Board of Examiners in compliance with the applicable provisions of this Code

Exam required

Yes [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Master Plumbers and Journeyman Plumbers must show that they have passed the ICC test to receive a plumbing license.

Exam provider

International Code Council (ICC) [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Master Plumbers and Journeyman Plumbers must show that they have passed the ICC test to receive a plumbing license.

License fee

$25 USD [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Journeyman Plumber $25 $25

Renewal term (years)

1 [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> The following Class D Plumbing licenses are issued for the term of one year by the Board of Examiners in compliance with the applicable provisions of this Code

Code book

International Plumbing Code [View source](https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf)

### What the source says

> The City has adopted the following construction codes: 2024 International Building Code (2024 IBC), 2024 International Residential Code (2024 IRC), 2024 International Plumbing Code (2024 IPC), 2024 International Mechanical Code (2024 IMC), 2024 International Fuel Gas Code (2024 IFGC), 2024 International Fire Code (2024 IFC), 2024 International Existing Building Code (2024 IEBC), 1997 Uniform Code for the Abatement of Dangerous Buildings, and the 2023 National Electric Code (2023 NEC).

Code edition

2024 [View source](https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf)

### What the source says

> The City has adopted the following construction codes: 2024 International Building Code (2024 IBC), 2024 International Residential Code (2024 IRC), 2024 International Plumbing Code (2024 IPC), 2024 International Mechanical Code (2024 IMC), 2024 International Fuel Gas Code (2024 IFGC), 2024 International Fire Code (2024 IFC), 2024 International Existing Building Code (2024 IEBC), 1997 Uniform Code for the Abatement of Dangerous Buildings, and the 2023 National Electric Code (2023 NEC).

Not stated in the official sources we checked: Experience, Classroom training, Exam questions, Exam time (minutes), Passing mark (%), Open book, Application fee, Exam fee, Continuing education, Minimum age, Prerequisite license, Insurance required, Bond required.

### Apprentice Plumber [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Apprentice Plumber:

Jurisdiction

City of Gillette [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> The following Class D Plumbing licenses are issued for the term of one year by the Board of Examiners in compliance with the applicable provisions of this Code

License fee

$5 USD [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> Apprentice Plumber $5 $5

Renewal term (years)

1 [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> The following Class D Plumbing licenses are issued for the term of one year by the Board of Examiners in compliance with the applicable provisions of this Code

Prerequisite license

employment with a Gillette licensed plumbing contractor [View source](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)

### What the source says

> (a) thirty days employment with a Gillette licensed plumbing contractor.

Code book

International Plumbing Code [View source](https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf)

### What the source says

> The City has adopted the following construction codes: 2024 International Building Code (2024 IBC), 2024 International Residential Code (2024 IRC), 2024 International Plumbing Code (2024 IPC), 2024 International Mechanical Code (2024 IMC), 2024 International Fuel Gas Code (2024 IFGC), 2024 International Fire Code (2024 IFC), 2024 International Existing Building Code (2024 IEBC), 1997 Uniform Code for the Abatement of Dangerous Buildings, and the 2023 National Electric Code (2023 NEC).

Code edition

2024 [View source](https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf)

### What the source says

> The City has adopted the following construction codes: 2024 International Building Code (2024 IBC), 2024 International Residential Code (2024 IRC), 2024 International Plumbing Code (2024 IPC), 2024 International Mechanical Code (2024 IMC), 2024 International Fuel Gas Code (2024 IFGC), 2024 International Fire Code (2024 IFC), 2024 International Existing Building Code (2024 IEBC), 1997 Uniform Code for the Abatement of Dangerous Buildings, and the 2023 National Electric Code (2023 NEC).

Not stated in the official sources we checked: Experience, Classroom training, Exam required, Exam provider, Exam questions, Exam time (minutes), Passing mark (%), Open book, Application fee, Exam fee, Continuing education, Minimum age, Insurance required, Bond required.

## Sources

Last checked 2026-11-16

1. 1. [https://www.cheyennecity.org/Services/Building-Safety](https://www.cheyennecity.org/Services/Building-Safety)
2. 2. [https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf](https://www.cheyennecity.org/files/sharedassets/public/v/3/departments/compliance-division/building/contractor-licensing-board-rules-and-regs-3.10.26.pdf)
3. 3. [https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php](https://www.casperwy.gov/services/building_and_inspections/contractor_licensing/individual_contractors.php)
4. 4. [https://www.casperwy.gov/Community%20Development/License%20Applications/Plumbing%20and%20Mechanical%20Revised%20Cover%20Sheet%20(Current%20Fees).pdf](https://www.casperwy.gov/Community%20Development/License%20Applications/Plumbing%20and%20Mechanical%20Revised%20Cover%20Sheet%20(Current%20Fees).pdf)
5. 5. [https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf](https://www.gillettewy.gov/files/assets/public/v/5/city-attorney/documents/05gcc_6-2026.pdf)
6. 6. [https://www.gillettewy.gov/files/assets/public/v/7/development-services/documents/2026-contractor-license-application-new-revised.pdf](https://www.gillettewy.gov/files/assets/public/v/7/development-services/documents/2026-contractor-license-application-new-revised.pdf)
7. 7. [https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf](https://www.gillettewy.gov/files/assets/public/v/5/development-services/documents/2026-new-individual-new-revised.pdf)

---

Source: https://tradecredentialregistry.com/us/wyoming/plumber/
